How to Compare Onsite Power Options on Total Cost, Not Equipment Price

Writer: Aegis Power
Aegis Power
3 hours ago
1 min read

Comparing power options by equipment price alone is how projects end up with the wrong answer. A lower upfront number can hide higher fuel, maintenance or downtime costs, and a higher one can pay back through speed and reliability.

A sound comparison puts every option on the same footing across a defined period, typically the planned life of the facility or the financing term.

The inputs that move the answer

  1. Installed cost. Equipment, interconnection, fuel infrastructure, permitting and commissioning.

  2. Operating cost. Fuel, scheduled maintenance, overhauls, staffing and monitoring.

  3. Utility cost avoided. Energy charges, demand and capacity charges, and the price of any upgrades the utility would require.

  4. Value of time. The revenue or production protected by energizing earlier.

  5. Value of reliability. What an outage costs per hour at your facility, and how often each option would prevent one.

  6. Financing. Owning, leasing or contracting for power each change how capital and risk are carried.

Why structure matters as much as technology

Two projects with identical equipment can have very different returns depending on who funds, owns and operates the plant. Structuring options range from owner-financed to fully outsourced development and operation. The right one depends on your balance sheet and how you want to deploy capital.

Aegis Power Solutions models each site against its real constraints and compares options on cost, speed and risk. If you would like an apples-to-apples view of your own site, call (855) 234-4787.

 
 
 