Onsite Power for Data Centers
Time to power now decides when a data center earns revenue. Utility interconnection queues in many markets stretch for years, and a campus that cannot energize on schedule carries its full capital cost while waiting. Aegis Power Solutions develops, finances and manages onsite generation so your load can come online on your timeline, and stay reliable once it does.
WHAT WE BUILD
Natural gas generation: reciprocating gas generator sets and mobile gas turbines for primary, bridge or backup power.
Microgrids: controls that let onsite generation, storage and the utility work together, with islanding capability.
Battery storage: peak management, ride-through and capacity support.
Solar integration where the site and economics support it.
Combined heat and power, where a use for the waste heat exists.
HOW WE APPROACH THE ECONOMICS
We model each site against your actual constraints: utility timeline, energy and capacity costs, uptime requirements and capital structure. Then we compare options on installed cost, operating cost, speed and risk, so the decision rests on return, not on a technology preference. Financing and long-term operation can be structured with us, so your capital stays focused on the facility.
QUESTIONS WE HEAR
How fast can onsite power be in service? It depends on equipment availability, air permitting and fuel supply. Mobile units can bridge the gap while permanent generation is permitted and built. We give you a site-specific schedule at the start of the conversation.
Can onsite power work alongside the utility? Yes. Many sites run grid-parallel, using onsite generation and the utility together, with the option to island. We design the controls and interconnection around your utility's requirements.
Who handles permitting and fuel? We manage the development path, including air permitting coordination and fuel supply planning, with your team involved at each decision point.